In July 2013, PUK-Solar completed the 13-hectare Nordenham solar park, with a total power of 6.0 MW.

The photovoltaic power plant was built on a landfill. The ground under the grass had been sealed with a layer of sheeting, so pile driving was not an option.

As an alternative, PUK cast about 4,000 cylindrical concrete elements on site and used them as foundations for the mounting structures.